Amanda Jones from EnergyAustralia provides a preview of the Marulan Gas-Fired Power Station modification report. This critical infrastructure project, located on Gundungurra country, is being updated to meet current environmental and technical standards and extend its operational window. The process includes comprehensive Aboriginal cultural heritage assessments, involving collaboration with registered Aboriginal parties and traditional knowledge holders to ensure respectful management of cultural sites.
Aboriginal Cultural Heritage Studies for the Marulan Gas Fired Power Station
Thumbnail